Existing Members, please login
Not a Member?
Three easy ways to become a member:
- Complete an inquiry form to have a representative contact you.
- Use the search box to the right to look up your affiliate and contact them directly.
- View a complete affiliate listing, select your affiliate based on location, and contact them directly.
For more information about membership questions in general, call 800-910-4283 or email membershipmanager@printing.org.
Find Your Affiliate
Because issues and needs often differ regionally across North America, membership begins at a local level, through your local affiliate association.
Enter your zip code below to locate your affiliate.
What is your Zipcode?
Technology and Research
Lean Practices
It may be hard to believe, but over 95% of the total time it takes to process a printing order and manufacture a printed product is non-value-added. Lean thinking focuses on identifying and eliminating all kinds of waste and non-value-added activities with the goals of reducing costs, faster throughput, improved financial performance, and higher customer satisfaction.
Lean for Printers by Printers
Waste is the dollar costs of time and materials that consume resources, but don’t add any actual value to the printed product, or result in product that is unacceptable to the customer. These waste activities must be eliminated, reduced, and integrated.
- Ignorance of the Current State: Lack of knowing and understanding the current state of equipment and processes; capabilities, performance, quality, and methods/techniques.
- Process Instability: Failure to keep equipment and processes at an essential state of reliability and performance through effective critical cares and maintaining necessary conditions
- Overproduction: Overproduction is when the amount produced by one process sooner or more than the next process needs or can handle. The result is large amounts of product spending long periods of time in WIP. Typical symptoms of overproduction include pulling jobs off a machine in the middle of a production run to make room for another job, production overtime that customers don’t pay for, large amounts of floor space clogged with skids of WIP, process bottlenecks, and warehouses filled with finished goods inventory.
- Waiting: Processes and people waiting for other processes to complete activities, the curse of downtime, machine breakdowns, defective product, and waiting on information are all non-value-added waste.
- Unnecessary Transporting: The time spent and extra equipment utilized to frequently valet tooling, materials, and WIP loads around the plant is non-value-added waste.
- Extra-Processing: The extra time spent on processing jobs due to long equipment changeover (makeready), continually quick-fixing quality-related print problems, extra actions and activities required due to poor job planning and mistakes, inadequate materials, and sudden mechanical problems from substandard press and equipment conditions.
- Inventory and WIP: The dollar cost of; raw materials, floor space, materials/components waiting for further processing, and warehoused finished goods waiting prior to delivery to customers then waiting for payment is waste.
- Motion: Includes time spent searching for and retrieving tooling and materials, process layout poor, waste from component installation and settings due to outdated technology and poor component conditions; waste from increased adjustments due to poor operation of equipment mechanisms, quick-fix quality activities due to unacceptable materials (paper, ink, coating, plates, etc.) and job components (production schedule, job tickets, and proofs, etc.), lack of poorly functioning tools, poor color management, abnormal equipment conditions, lack of teamwork and process organization.
- Product Defects: Time and materials wasted producing defective product. Waste from product defects includes employee time spent, materials, and equipment utilized inspecting and sorting defective product, and in identifying and handling non-conforming product.
- Waste of People: Includes not utilizing people’s mental, creative, and teamwork abilities. Waste through the existence of antiquated thinking, department politics, resistance to change (not invented here), fear of repercussions to new ideas from a not-invented-here culture, lack of timely feedback, poor hiring practices, and little or no investment in effective training.
Custom Training
- On-site Lean education and training available from The Center for Technology and Research
On-site Help and Facilitation
- Lean and Productivity Assessments
- Determine current state of processes and workflow
- Recommendations to slash waste, reduce downtime, solve print problems, and improve quality
- Value-Stream Mapping
- Identify waste in the value stream
- Find the constraint process
- Identify where to target system improvements
- 5S: Sort ® Straighten ® Shine ® Standardize ® Sustain
- Achieve clean and organized processes
- Implement visual management systems
- Quick-Response Makeready
- Quick Changeover—Single Minute Exchange of Die
- Implement 5S quick changeover
- Streamline changeover procedures and methods
- Total Production Maintenance (TPM)
- Maintenance and Critical cares
- Pit Stop Maintenance
- Achieve the official Print Production Excellence Accreditation certificate
Publications
- Total Production Maintenance: A Guide for the Printing Industry
- Lean Printing: Pathway to Success
- Hot Topics: From the Center for Lean Practices Lean Manufacturing 2
Webinars
- Real World of Lean for Print Managers
- 5S and Quick Changeover
- Maximize Press Time with Pit-Stop Maintenance
Other Resources
- How Lean is Print by David Dodd, Ken Rizzo, and Jim Workman
- The Printer’s Hidden Factory of Waste by Ken Rizzo
- 5-S for Printers by Ken Rizzo
For more information and to schedule a consultation, contact Printing Industries of America 412-527-2403, or consult@printing.org.
Published on Thursday, March 19, 2009 (updated 08/26/2010)
- We have 101 amazing print pieces for you to view in our PPA photo gallery: http://bit.ly/cqBg0114 hours 10 min ago
- Check-in to our GRAPH EXPO booth on foursquare for an exclusive prize - @mbossed has a nice tutorial here - http://bit.ly/aIrucq14 hours 56 min ago
- As though you needed any more justification, here are 6 reasons to keep #print in your marketing mix by @marketingprofs http://bit.ly/9M1wkA15 hours 49 min ago
- Dept. of Labor, Wage/Hour FY 2009 Enforcement Statistics, obtained by our Dept. of Labor via Freedom of Information Act http://bit.ly/9gW9si16 hours 6 min ago
- RT @juliesdpc: Going to GRAPHEXPO? Join me for lunch! Topic: Taking social media to the next level. Tues Oct 5 12:15pm http://tinyurl.co ...19 hours 2 min ago














